Update on The Carlisle!

1502-Coming-soon

1502-Build

This past month consisted of blowing in insulation, installing drywall, preparing the walls for paint, and installing the site-finished white oak hardwood floors. Our next steps will be installing the millwork/wainscoting and tile throughout the home. As seen in the picture of the dining room above on the left, the rooms in this home are flooded with an abundance of natural light. This is turning out to be a spectacular home on a gorgeous lot and we are still tracking to a completion date around the first of the year.